Overview
Civitech Strings is centrally located within the heart of Gr. Noida West with close proximity to all the necessary amenities like banks, malls, shopping complexes and other things which are necessary for a soulful living. The apartments are constructed in such a way that it enhances seamless flow of breeze throughout the rooms. Civitech Strings is constructed in 2 BHK/3 BHK configurations. Civitech Strings is a perfect residential apartment, where you will find fully gated community with 4 towers constructed in a manner that you can find a lot of space nestled among nature and greenery. Living in Civitech Strings means you are constantly in the joy, right in the heart of the megacity.
- Status Ready to move
- Area 4.45 acres (18.0K sq.m.)
- Location Sector-12, Greater Noida West
- Type Residential Property
- Total Floors27
- Total Towers4
- Flat Size2BHK - 1090 Sq.Ft. | 3BHK - 1250 Sq.Ft | 3 BHK - 1275 Sq.Ft.
- Units836
Highlights
- All Modern Amenities like Swimming Pool, Gymnasium, Power Backup and more
- Podium based project for extra security, privacy & noise free environment
- 5 minute drive from Char Moorti Chowk
- 70% open and green creative space
- Well ventilated and spacious apartments
- Ample car parking
- Close proximity to schools, hospitals and colleges
Floor Plans
Civitech Strings Price List
Configuration | Size | Price |
2BHK Apartment | 1090 sq.ft. | Rs. 93.7 Lacs |
3 BHK TYPE-1 Apartment | 1250 sq.ft. | Rs. 1.07 Cr |
3 BHK TYPE-2 Apartment | 1275 sq.ft. | Rs. 1.09 Cr |
Amenities
Surveillance System
Children's play area
24x7 Security
Flooring
Firefighting System
AC Community Hall
Swimming Pool
Fitness Center
Others Overview
Demarcation of Plots
Project Plot Area is 18000 Sq.m. Plot Will Be Demarcated by Boundary Walls Made of Rcc Frameworks and Brickwork. Having Height of 8 FeetBoundary Wall
Boundary Wall Made of Masonary Pucca, Rcc Framework Between Other Plots. Boundary Wall Made of Masonary Pucca Rcc Framework , Jaali With Planters in Front of Commercial.Road Work
Internal Road on Extended Basement Slab Designed as Per Fire Tender Load Finished With Cement Concrete Inter-locking Tiles With Kerb Stone on Sides for Motorable Vehicular Movement and Fire Tender Movement.Footpaths
Footpaths Will Be of Cement Concrete/stone/grass Pavers/ Interlocking Tiles. Shall Be Constructed in Order to Allow in Filtration of Surface Runoff of RainwaterWater Supply Including Drinking Water Facilities
Project Having Dual Source of Water Supply. One From Water Supply Available From Authority Sources and Second Water to Be Collected in Under Ground and Terrace Tanks Equipped With Hydro Pneumatic Pump.Sewer System
Sewer Will Be Connected Through Sewer Line From All Wc and Then Into Collection Chamber for Sewerage Treatment (Stp) as Ec Conditions.Drain
Surface Rainwater Will Be Collected via Drain Lines From Balconies , Roof Top , Open Areas Into Rainwater Harvesting Pits to Recharge the Ground Water Level.Parks
Landscape With Civil Work of Masonary and Stone, Horticulture Work and Various Types of Plantation Landscape Architect.Solid Waste Management and Disposal System
Project Use Organic Waste Converter to Treat Solid Waste , Collection Bins and Segregation Table Will Be Provided.Water Conservation System
Usage of Dual Flush Systems for Flush Cisterns. Rain Water Harvesting System, Drip Irrigation With Sprinklers.Fire Protection and Fire Safety System
Basement Hydrant, Sprinklers, 2 Nos. Of Electrical Pump of 2850 Lpm, 2 Nos. Of Diesel Pump of 2850 Lpm, 2 Nos. Of Jockey Pumps of 180 Lpm, Water Curtain Pump of 2850 Lpm.Social Infrastructure and Other Public Amenities Including Public Health Services
Proper Water Supply and Sanitary Facilities in Visitor Toilets at Ground Floor of Every Tower. Emergency Evacuation Services All Towers Have Balconies and Two Staircases for Emergency Evacuation Used for Fire and Life Safety Other Miscellaneous Work Guard Room at Main Entry and Exit Gate, Electrical Room /electrical Sub-station , Entrance Lobbies at Ground Floor in All Towers. Cctv Surveillance System at Entry and Exit Point.Tree Planting
Trees Planting Along Boundary of the Plot as Per Sanctioned Drawing From Authority.Design for Electric Supply Including Street Lighting
Street Lighting Will Have Dual Source of Power. One is Solar Power and Another is Power Supply From N.p.c.l. As Per Required/ Sanctioned Load for Common Area and Facilities Along With D.g. Power Back-up.Community Buildings
Community Building Having Banquet at Ground Floor With Its Ancillary Areas, Air Conditioned Gym at First Floor Indoor Game Facilities at Ground Floor.Treatment and Disposal System of Sewage and Sullage Water
Sewage Waste and Sullage Water Will Be Treated by S.t.p. Of 345 Kld Capacity . Treated Water Will Be Used for Plantation and Rest Will Be Released Through Authority Sewerage System.Location Advantages
Address
- GD Goenka Intl School: 3.8 Km
- Arogaya Hospital: 3.8 km
- World Business Centre: 6.2km
- Grand Trunk Road: 6.2 km
- JIMS Noida Extension College: 7.5 km
- Gaur City Mall: 8.3 KM
- Gaurs Sarovar Premiere: 9.2 KM
- Sport Stadium, Dujana: 9.3 KM
- Ghaziabad Railway Station: 14.8 KM
- Indira Gandhi Intl Airport: 46 KM
Contact Details
Phone
+91-9654443337About Civitech Developers
Make an Appointment Now
Wish to get a call back from our team? Fill in your details.